PMN1
26th April 2009, 20:48
Were there plans for any of the loosing companies who bid for the B.12/36, P13/36 and B.1/39 specifications to build the winning designs?
Would each of the specifications have been narrowed down to one design or would both have been produced in case of problems encountered later on?
Would each of the specifications have been narrowed down to one design or would both have been produced in case of problems encountered later on?